#TITLE_ALTERNATIVE#
<p align="justify">Port of Patimban is needed to increase the logistic process in Java because of the bad traffic index in Jakarta, which in turn hampered the logistic process heading to and from port of Tanjung Priok. Port of Patimban is planned to accommodate 7.5 million TEUs/year...
Saved in:
Main Author: | SUAGIAT (NIM : 15514033), CHRISTOPHER |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26275 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: NIM : 10714059, CHRISTOPHER -
#TITLE_ALTERNATIVE#
by: KURNIAWAN (NIM 13504117), CHRISTOPHER -
#TITLE_ALTERNATIVE#
by: Laurence (NIM 135 03 067), Christopher -
#TITLE_ALTERNATIVE#
by: Chandra Kriswanto (NIM 15002010 ) ; Eka Susanto NIM 15002010 (NIM 15002095), Aqri -
#TITLE_ALTERNATIVE#
by: (NIM:15002152) ; Rizal Kurniadi ( NIM:15002147), William