<p align="justify"> Indonesia is a country with abundant oil and gas energy resources. The majority of these resources are located in the ocean. After exploration and exploitation of these energy resources, the product needs to be stored and processed. The majority of storage and pro...

Full description

Saved in:
Bibliographic Details
Main Author: ADAM SUGIHARTO (NIM : 15514017), CLIFF
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26315
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26315
spelling id-itb.:263152018-09-28T14:33:14Z#TITLE_ALTERNATIVE# ADAM SUGIHARTO (NIM : 15514017), CLIFF Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26315 <p align="justify"> Indonesia is a country with abundant oil and gas energy resources. The majority of these resources are located in the ocean. After exploration and exploitation of these energy resources, the product needs to be stored and processed. The majority of storage and processing facility are located in coastal areas. One of the storage and processing facilities is Pertamina Refinery Unit IV, located in the coastal area of Cilacap, Central Java. To facilitate the mobilization of oil and gas in that area, several jetty is constructed. To overcome the obstacles that might occur during construction, a construction process and planning is needed. Construction management aims to regulate the <br /> <br /> implementation of construction in accordance with existing limitations, so that optimal results can be obtained, both in terms of budget cost, time effectiveness and designed quality. Construction management planning is based on <br /> <br /> several theories, namely project management theory (POAC), construction method planning and influencing factors, <br /> <br /> basic calculation of volume, productivity, and duration of work, duration and scheduling dependency analysis, and <br /> <br /> project cost estimation and budgeting. To produce optimal planning, a literature study and data collection in the form of specifications and technical detail drawings are needed to calculate work volume and determination of construction methods. After identifying the details of the work needed, a work breakdown structure (WBS) is created. PDM is made to help scheduling. In this scheduling process an iteration process is carried out so that the optimal work duration is generated. After all of the above work is done, the cost is finally calculated to estimate the amount of money needed for this construction and it is presented with the S curve. <p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify"> Indonesia is a country with abundant oil and gas energy resources. The majority of these resources are located in the ocean. After exploration and exploitation of these energy resources, the product needs to be stored and processed. The majority of storage and processing facility are located in coastal areas. One of the storage and processing facilities is Pertamina Refinery Unit IV, located in the coastal area of Cilacap, Central Java. To facilitate the mobilization of oil and gas in that area, several jetty is constructed. To overcome the obstacles that might occur during construction, a construction process and planning is needed. Construction management aims to regulate the <br /> <br /> implementation of construction in accordance with existing limitations, so that optimal results can be obtained, both in terms of budget cost, time effectiveness and designed quality. Construction management planning is based on <br /> <br /> several theories, namely project management theory (POAC), construction method planning and influencing factors, <br /> <br /> basic calculation of volume, productivity, and duration of work, duration and scheduling dependency analysis, and <br /> <br /> project cost estimation and budgeting. To produce optimal planning, a literature study and data collection in the form of specifications and technical detail drawings are needed to calculate work volume and determination of construction methods. After identifying the details of the work needed, a work breakdown structure (WBS) is created. PDM is made to help scheduling. In this scheduling process an iteration process is carried out so that the optimal work duration is generated. After all of the above work is done, the cost is finally calculated to estimate the amount of money needed for this construction and it is presented with the S curve. <p align="justify">
format Final Project
author ADAM SUGIHARTO (NIM : 15514017), CLIFF
spellingShingle ADAM SUGIHARTO (NIM : 15514017), CLIFF
#TITLE_ALTERNATIVE#
author_facet ADAM SUGIHARTO (NIM : 15514017), CLIFF
author_sort ADAM SUGIHARTO (NIM : 15514017), CLIFF
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/26315
_version_ 1822020972148948992