VALUATION OF UPSTREAM GAS PROJECT USING DISCOUNTED CASH FLOW, MONTE CARLO SIMULATION, AND SENSITIVITY ANALYSIS (CASE STUDY OF CORAL BLOCK)
This final project in specific case will do analysis project valuation of Coral Block, that currently is in exploration stage, by using methodology quantitative method to calculate project valuation based on cash flow. With the result of financial valuation, it could help management, as decision mak...
Saved in:
Main Author: | V. ANSADHA (NIM 29115495), DAISY |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26344 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
by: Nadrul Jamal, M -
ECONOMIC VALUATION OF OPEN PIT COAL MINING SCENARIO IN PT BERAU COAL SITE BINUNGAN BLOCK 8: COMPARATION OF DISCOUNTED CASH FLOW METHOD AND MONTE CARLO SIMULATION
by: Depi Putra, Mahardhika -
ECONOMIC EVALUATION OF NICKEL MINING PROJECT AT SOROWAKO BLOCK USING DISCOUNTED CASH FLOW AND MONTE CARLO SIMULATION (CASE STUDY OF PT VALE INDONESIA TBK)
by: Faqiih, Muhammad -
RISK ANALYSIS OF PT MERDEKA COPPER GOLD TBK STOCK PRICE USING DISCOUNTED CASH FLOW, MONTE CARLO SIMULATION, AND RELATIVE VALUATION
by: Khalid Al Ayyubi, Muhammad -
ECONOMIC EVALUATION OF LONGWALL COAL MINE IN PT XYZ: MODEL COMPARISON BETWEEN DISCOUNTED CASH FLOW, MONTE CARLO SIMULATION, AND REAL OPTION VALUATION
by: Anggoro, Indra