PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driv...