PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driv...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69949 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driven by surface motor installed at wellhead, above x-mas tree. Electrical power is required to run the motor.
With no electricity source available, there are three strategy options that need to be chosen to commence the project. First is “cable laying” option which has high capital upfront with very low operating costs. Second is “in situ genset installation” option which has lower capital with higher operating costs. And third is “rental basis” option which has very low upfront capital but much higher operating cost.
Method used to evaluate the project is quantitative approach by calculating project economic and financial parameters using discounted cashflow analysis to compare which options are most profitable. The second consideration is sensitivity analysis to determine what parameter most affects each option. And the third consideration is risks analysis using Monte Carlo simulation to define which option has the most robust parameters.
Discounted cash flow analysis shows Net Present Value of Tambora insert PCP Project valuation is positive at range 1.32-1.44 Million USD, which indicates as base case all options are feasible economically. Scenario analysis shows the lowest project net present value or NPV is negative, and the maximum NPV is almost twice. The sensitivity analysis of several parameters shows that this project is very sensitive to changes in oil price and oil production volume. And finally, Monte Carlo simulation shows that probability of failure is ranging from 10% to 30%, which means the project has different risks based on options.
In conclusion, comparing parameters from all the analysis, it is recommended to commence the project with Option-3, the rental basis option. Although not the highest, Option-3 provided the second best NPV with a very small difference with the first. It gives the best result for other economic and financial parameters. And in terms of risk, it has the lowest risks among other options.
|
---|