PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)

To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driv...

Full description

Saved in:
Bibliographic Details
Main Author: Nadrul Jamal, M
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/69949
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69949
spelling id-itb.:699492022-12-21T10:11:06ZPROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT) Nadrul Jamal, M Manajemen umum Indonesia Theses Capital Rationing, Project Valuation. Discounted Cash Flow Analysis, Scenario Analysis, Sensitivity Analysis, Monte Carlo Simulation, Risk Mitigation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69949 To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driven by surface motor installed at wellhead, above x-mas tree. Electrical power is required to run the motor. With no electricity source available, there are three strategy options that need to be chosen to commence the project. First is “cable laying” option which has high capital upfront with very low operating costs. Second is “in situ genset installation” option which has lower capital with higher operating costs. And third is “rental basis” option which has very low upfront capital but much higher operating cost. Method used to evaluate the project is quantitative approach by calculating project economic and financial parameters using discounted cashflow analysis to compare which options are most profitable. The second consideration is sensitivity analysis to determine what parameter most affects each option. And the third consideration is risks analysis using Monte Carlo simulation to define which option has the most robust parameters. Discounted cash flow analysis shows Net Present Value of Tambora insert PCP Project valuation is positive at range 1.32-1.44 Million USD, which indicates as base case all options are feasible economically. Scenario analysis shows the lowest project net present value or NPV is negative, and the maximum NPV is almost twice. The sensitivity analysis of several parameters shows that this project is very sensitive to changes in oil price and oil production volume. And finally, Monte Carlo simulation shows that probability of failure is ranging from 10% to 30%, which means the project has different risks based on options. In conclusion, comparing parameters from all the analysis, it is recommended to commence the project with Option-3, the rental basis option. Although not the highest, Option-3 provided the second best NPV with a very small difference with the first. It gives the best result for other economic and financial parameters. And in terms of risk, it has the lowest risks among other options. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Nadrul Jamal, M
PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
description To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driven by surface motor installed at wellhead, above x-mas tree. Electrical power is required to run the motor. With no electricity source available, there are three strategy options that need to be chosen to commence the project. First is “cable laying” option which has high capital upfront with very low operating costs. Second is “in situ genset installation” option which has lower capital with higher operating costs. And third is “rental basis” option which has very low upfront capital but much higher operating cost. Method used to evaluate the project is quantitative approach by calculating project economic and financial parameters using discounted cashflow analysis to compare which options are most profitable. The second consideration is sensitivity analysis to determine what parameter most affects each option. And the third consideration is risks analysis using Monte Carlo simulation to define which option has the most robust parameters. Discounted cash flow analysis shows Net Present Value of Tambora insert PCP Project valuation is positive at range 1.32-1.44 Million USD, which indicates as base case all options are feasible economically. Scenario analysis shows the lowest project net present value or NPV is negative, and the maximum NPV is almost twice. The sensitivity analysis of several parameters shows that this project is very sensitive to changes in oil price and oil production volume. And finally, Monte Carlo simulation shows that probability of failure is ranging from 10% to 30%, which means the project has different risks based on options. In conclusion, comparing parameters from all the analysis, it is recommended to commence the project with Option-3, the rental basis option. Although not the highest, Option-3 provided the second best NPV with a very small difference with the first. It gives the best result for other economic and financial parameters. And in terms of risk, it has the lowest risks among other options.
format Theses
author Nadrul Jamal, M
author_facet Nadrul Jamal, M
author_sort Nadrul Jamal, M
title PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
title_short PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
title_full PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
title_fullStr PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
title_full_unstemmed PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
title_sort project capital rationing using discounted cash flow method, sensitivity analysis & monte carlo simulation (case study tambora oil development)
url https://digilib.itb.ac.id/gdl/view/69949
_version_ 1822006171035238400