#TITLE_ALTERNATIVE#

Improvement on oil and gas production efficiency is implemented by well intervention on Tension Leg <br /> <br /> Platform at Makassar Strait using moored Accommodation Work Barge (AWB). Re-analysis of integrity <br /> <br /> parameters must be performed with new additions on...

Full description

Saved in:
Bibliographic Details
Main Author: BAGAS HANANDITYO (NIM : 15514029), DEVARA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26526
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Improvement on oil and gas production efficiency is implemented by well intervention on Tension Leg <br /> <br /> Platform at Makassar Strait using moored Accommodation Work Barge (AWB). Re-analysis of integrity <br /> <br /> parameters must be performed with new additions on existing mooring system to prevent accidents. In this study, <br /> <br /> design and analysis of mooring system on TLP at Makassar Strait is performed which includes line tension, TLP <br /> <br /> offset, and vessel clearance on regular wave load, random wave load in intact condition, and random wave load <br /> <br /> in damaged condition according to criterion from API RP2SK and DNV-OS-E301 using Orcaflex and MOSES <br /> <br /> so that a design that satisfies those conditions is obtained.