TIN MINING PRODUCTION SCHEDULING IN PT XYZ

PT XYZ is one of the tin mining companies in Indonesia located in Bangka Belitung Islands. PT XYZ will mine in one of its mining operation areas, called area B, using open pit mining system. Area B has two mining locations named Block 1 and Block 3. PT XYZ expects an annual production rate of 1200 t...

Full description

Saved in:
Bibliographic Details
Main Author: ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26577
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26577
spelling id-itb.:265772018-10-02T08:56:18ZTIN MINING PRODUCTION SCHEDULING IN PT XYZ ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26577 PT XYZ is one of the tin mining companies in Indonesia located in Bangka Belitung Islands. PT XYZ will mine in one of its mining operation areas, called area B, using open pit mining system. Area B has two mining locations named Block 1 and Block 3. PT XYZ expects an annual production rate of 1200 tonnes of tin from area B. <br /> <br /> Mining production scheduling will be simulated using the MineSched software. The mining scenario is focused on the mining sequence of Block 1 and Block 3. There are three scenarios that are made where in the first scenario, Block 1 will be mined first followed by Block 3, in the second scenario Block 3 will be mined first followed by Block 1 and in the third scenario both of Block 1 and Block 3 will be mined simultaneously. <br /> <br /> Based on economic analysis, the first scenario has NPV of US$1.489.588,73 with IRR of 15.91% and the payback period of it will be reached after 7 years. The second scenario has NPV of US$6.164.454,50 with IRR of 25.63% and the payback period of it will be reached after 4 years. The third scenario has NPV of US$2.384.387,03 with IRR of 17.30% and the payback period of it will be reached after 6 years. From the three scenarios above, it can be concluded that the best scenario is the second scenario that started from Block 3 and then continued by Block 1. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT XYZ is one of the tin mining companies in Indonesia located in Bangka Belitung Islands. PT XYZ will mine in one of its mining operation areas, called area B, using open pit mining system. Area B has two mining locations named Block 1 and Block 3. PT XYZ expects an annual production rate of 1200 tonnes of tin from area B. <br /> <br /> Mining production scheduling will be simulated using the MineSched software. The mining scenario is focused on the mining sequence of Block 1 and Block 3. There are three scenarios that are made where in the first scenario, Block 1 will be mined first followed by Block 3, in the second scenario Block 3 will be mined first followed by Block 1 and in the third scenario both of Block 1 and Block 3 will be mined simultaneously. <br /> <br /> Based on economic analysis, the first scenario has NPV of US$1.489.588,73 with IRR of 15.91% and the payback period of it will be reached after 7 years. The second scenario has NPV of US$6.164.454,50 with IRR of 25.63% and the payback period of it will be reached after 4 years. The third scenario has NPV of US$2.384.387,03 with IRR of 17.30% and the payback period of it will be reached after 6 years. From the three scenarios above, it can be concluded that the best scenario is the second scenario that started from Block 3 and then continued by Block 1.
format Final Project
author ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA
spellingShingle ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA
TIN MINING PRODUCTION SCHEDULING IN PT XYZ
author_facet ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA
author_sort ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA
title TIN MINING PRODUCTION SCHEDULING IN PT XYZ
title_short TIN MINING PRODUCTION SCHEDULING IN PT XYZ
title_full TIN MINING PRODUCTION SCHEDULING IN PT XYZ
title_fullStr TIN MINING PRODUCTION SCHEDULING IN PT XYZ
title_full_unstemmed TIN MINING PRODUCTION SCHEDULING IN PT XYZ
title_sort tin mining production scheduling in pt xyz
url https://digilib.itb.ac.id/gdl/view/26577
_version_ 1821934119278346240