OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
This research focuses on mine planning and production scheduling for PT XYZ, a kaolin producer for cement raw materials in South Kalimantan, utilizing Micromine Origin & Beyond 2024.5 software. The study aims to optimize kaolin extraction for the cement industry over a 12-year mine life. The...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85159 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |