OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN

This research focuses on mine planning and production scheduling for PT XYZ, a kaolin producer for cement raw materials in South Kalimantan, utilizing Micromine Origin & Beyond 2024.5 software. The study aims to optimize kaolin extraction for the cement industry over a 12-year mine life. The...

Full description

Saved in:
Bibliographic Details
Main Author: Usama
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85159
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:85159
spelling id-itb.:851592024-08-19T15:58:27ZOPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN Usama Indonesia Final Project Production scheduling, Ultimate Pit Limit, Net value. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/85159 This research focuses on mine planning and production scheduling for PT XYZ, a kaolin producer for cement raw materials in South Kalimantan, utilizing Micromine Origin & Beyond 2024.5 software. The study aims to optimize kaolin extraction for the cement industry over a 12-year mine life. The analysis begins with the creation of an Ultimate Pit Limit design to determine the extractable mineral reserves, reaching 83.8% of the total resources due to technical limitations such as overall slope angles and the company's mining business permit (WIUP) boundaries. The resulting mine plan design indicates that peak production is achieved in 2036 with a target tonnage of 576 thousand tons. To meet this target, 3 units of PC 200 Excavator for kaolin and overburden excavation, and 5 units of Hino FM 260 Dump Truck are required. Economic analysis shows the highest net value of 6.1 billion rupiah in 2034, with a total net value of 64.4 billion rupiah. Revenue reaches 204.26 billion rupiah, while costs amount to 139.85 billion rupiah. The results of this research highlight the importance of thorough planning in the mining industry to achieve optimal production and profitable economic outcomes. The implementation of an efficient mine design and scheduling strategy is key to successfully maximizing the utilization of mineral resources within the given permit limits. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This research focuses on mine planning and production scheduling for PT XYZ, a kaolin producer for cement raw materials in South Kalimantan, utilizing Micromine Origin & Beyond 2024.5 software. The study aims to optimize kaolin extraction for the cement industry over a 12-year mine life. The analysis begins with the creation of an Ultimate Pit Limit design to determine the extractable mineral reserves, reaching 83.8% of the total resources due to technical limitations such as overall slope angles and the company's mining business permit (WIUP) boundaries. The resulting mine plan design indicates that peak production is achieved in 2036 with a target tonnage of 576 thousand tons. To meet this target, 3 units of PC 200 Excavator for kaolin and overburden excavation, and 5 units of Hino FM 260 Dump Truck are required. Economic analysis shows the highest net value of 6.1 billion rupiah in 2034, with a total net value of 64.4 billion rupiah. Revenue reaches 204.26 billion rupiah, while costs amount to 139.85 billion rupiah. The results of this research highlight the importance of thorough planning in the mining industry to achieve optimal production and profitable economic outcomes. The implementation of an efficient mine design and scheduling strategy is key to successfully maximizing the utilization of mineral resources within the given permit limits.
format Final Project
author Usama
spellingShingle Usama
OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
author_facet Usama
author_sort Usama
title OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
title_short OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
title_full OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
title_fullStr OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
title_full_unstemmed OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
title_sort optimization and scheduling open pit mining at pt xyz clay mining in south kalimantan
url https://digilib.itb.ac.id/gdl/view/85159
_version_ 1822010625746796544