DESIGN OF FLUE GAS DESULFURIZATION ON AIR POLLUTION CONTROL AT CIREBON COAL POWER PLANT 2ND UNIT

In order to fulfill the government's program to achieve the target of 35,000 MW power plant, Cirebon Coal Power Plant 2nd Unit will be constructed with 1.000 MW capacity. Coal consumption to achieve that capacity is 11.000 tons/day or 4.015.000 tons/year. The coal contain 0,28% sulfur. Based on...

Full description

Saved in:
Bibliographic Details
Main Author: SHOFI RACHMADITA , DHEA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26579
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia