PROPOSED DESIGN OF AIR POLLUTION CONTROL SYSTEM FOR UNIT 1 OF PT PLN (PERSERO) LABUHAN ANGIN SECTOR POWER PLANT
Labuhan Angin Power Plant is a coal-fired power plant owned by PT PLN (Persero) and is one of the work units of PT PLN (Persero) North Sumatra Sector. Labuhan Angin Power Plant has two generating units with a capacity of each plant of 115 MW, but in its current operations the average capacity genera...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26625 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |