BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU

The scarcity of energy is starting to be felt so much higher in these days, <br /> <br /> especially the scarcity of water and electricity. Those scarcity usually felt in an <br /> <br /> urban city especially in a capitol city such as Jakarta. It’s because of the increasi...

Full description

Saved in:
Bibliographic Details
Main Author: Angga Bayu Putro ( 15813009), Dwi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26771
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26771
spelling id-itb.:267712018-03-16T13:34:59ZBASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU Angga Bayu Putro ( 15813009), Dwi Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26771 The scarcity of energy is starting to be felt so much higher in these days, <br /> <br /> especially the scarcity of water and electricity. Those scarcity usually felt in an <br /> <br /> urban city especially in a capitol city such as Jakarta. It’s because of the increasing <br /> <br /> demand for water that related to the growth of its citizen, while the availability of <br /> <br /> the water resources is not really increasing but actually is decreasing. So, we need <br /> <br /> to maintain the water resources balance by using a kind of reservoir as a storage <br /> <br /> when the scarcity happen. One of the solution is building a dam which will be <br /> <br /> explained in this study. <br /> <br /> The method used in this study are (1) hydrological analysis, (2) discharge <br /> <br /> modelling calculation, (3) dam design, and (4) budget calculation. There are four <br /> <br /> conclusion we got based on the result, those are (1) volume capacity of the dam that <br /> <br /> available to be used is 4,102 m3 each year, (2) the dam is able to provide 0,557 m3/s <br /> <br /> discharge to fulfil the raw water needs of Leihitu’s people until 2067 (50 years from <br /> <br /> now), (3) the dam can produce 32,77 kW of minimum electricity each month, and <br /> <br /> 1478,63 kW of electricity around the year, and also (4) based on those demands, <br /> <br /> the dam should be 45 meters height and 237 meters largest width, and the materials <br /> <br /> used to fill the earth dam is core clay and rockfill of andesite. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The scarcity of energy is starting to be felt so much higher in these days, <br /> <br /> especially the scarcity of water and electricity. Those scarcity usually felt in an <br /> <br /> urban city especially in a capitol city such as Jakarta. It’s because of the increasing <br /> <br /> demand for water that related to the growth of its citizen, while the availability of <br /> <br /> the water resources is not really increasing but actually is decreasing. So, we need <br /> <br /> to maintain the water resources balance by using a kind of reservoir as a storage <br /> <br /> when the scarcity happen. One of the solution is building a dam which will be <br /> <br /> explained in this study. <br /> <br /> The method used in this study are (1) hydrological analysis, (2) discharge <br /> <br /> modelling calculation, (3) dam design, and (4) budget calculation. There are four <br /> <br /> conclusion we got based on the result, those are (1) volume capacity of the dam that <br /> <br /> available to be used is 4,102 m3 each year, (2) the dam is able to provide 0,557 m3/s <br /> <br /> discharge to fulfil the raw water needs of Leihitu’s people until 2067 (50 years from <br /> <br /> now), (3) the dam can produce 32,77 kW of minimum electricity each month, and <br /> <br /> 1478,63 kW of electricity around the year, and also (4) based on those demands, <br /> <br /> the dam should be 45 meters height and 237 meters largest width, and the materials <br /> <br /> used to fill the earth dam is core clay and rockfill of andesite.
format Final Project
author Angga Bayu Putro ( 15813009), Dwi
spellingShingle Angga Bayu Putro ( 15813009), Dwi
BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
author_facet Angga Bayu Putro ( 15813009), Dwi
author_sort Angga Bayu Putro ( 15813009), Dwi
title BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
title_short BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
title_full BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
title_fullStr BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
title_full_unstemmed BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
title_sort basic dam design for raw water and electricity needs in negeri lima, leihitu, central maluku
url https://digilib.itb.ac.id/gdl/view/26771
_version_ 1822922031676522496