ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM

The coal mining industry operates starting from stripping the ground cover to obtaining a coal deposit or called ROM (run of mine) sending it ROM to the port using a fleet of truckloads to the port stockpile to be further processed by crusher to get the product or called a cargo of size according to...

Full description

Saved in:
Bibliographic Details
Main Author: T. P. SIDABUTAR NIM 23415028 , ERLINGGOM
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26965
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26965
spelling id-itb.:269652018-10-01T11:08:37ZANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM T. P. SIDABUTAR NIM 23415028 , ERLINGGOM Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26965 The coal mining industry operates starting from stripping the ground cover to obtaining a coal deposit or called ROM (run of mine) sending it ROM to the port using a fleet of truckloads to the port stockpile to be further processed by crusher to get the product or called a cargo of size according to customer request. Cargo is then transferred to the vessel by conveyor belt, the use of crusher and belt conveyor as a system is called fix material handling system or in the company better known as material handling system (MHS). <br /> <br /> Problems often encountered during coal transport operations is the presence of interference in MHS in the form of availaibility and low performance caused by inefficient maintenance system. To minimize the operational disruption, it is necessary to analyze the proper maintenance system in order to optimally perform the operational productivity. <br /> <br /> Development of simulation using system dynamics in MHS maintenance system helps in analyzing maintenance system so that it can apply optimum maintenance policy towards MHS. This study aims to explain the effect of corrective maintenance (CM) action changes on the repair rate, preventive maintenance (PM) action on the failure rate that affects the availability and project improvement (PI) to performance, thus increasing the OEE. The performance of OEE as an indicator of MHS maintenance policy system success will affect the income modeled as net value. The highest net value is obtained with a value of $ 49.09 / ton of coal in 2027. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The coal mining industry operates starting from stripping the ground cover to obtaining a coal deposit or called ROM (run of mine) sending it ROM to the port using a fleet of truckloads to the port stockpile to be further processed by crusher to get the product or called a cargo of size according to customer request. Cargo is then transferred to the vessel by conveyor belt, the use of crusher and belt conveyor as a system is called fix material handling system or in the company better known as material handling system (MHS). <br /> <br /> Problems often encountered during coal transport operations is the presence of interference in MHS in the form of availaibility and low performance caused by inefficient maintenance system. To minimize the operational disruption, it is necessary to analyze the proper maintenance system in order to optimally perform the operational productivity. <br /> <br /> Development of simulation using system dynamics in MHS maintenance system helps in analyzing maintenance system so that it can apply optimum maintenance policy towards MHS. This study aims to explain the effect of corrective maintenance (CM) action changes on the repair rate, preventive maintenance (PM) action on the failure rate that affects the availability and project improvement (PI) to performance, thus increasing the OEE. The performance of OEE as an indicator of MHS maintenance policy system success will affect the income modeled as net value. The highest net value is obtained with a value of $ 49.09 / ton of coal in 2027.
format Theses
author T. P. SIDABUTAR NIM 23415028 , ERLINGGOM
spellingShingle T. P. SIDABUTAR NIM 23415028 , ERLINGGOM
ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM
author_facet T. P. SIDABUTAR NIM 23415028 , ERLINGGOM
author_sort T. P. SIDABUTAR NIM 23415028 , ERLINGGOM
title ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM
title_short ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM
title_full ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM
title_fullStr ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM
title_full_unstemmed ANALISIS KEBIJAKAN MAINTENANCE FIX MATERIAL HANDLING SYSTEM
title_sort analisis kebijakan maintenance fix material handling system
url https://digilib.itb.ac.id/gdl/view/26965
_version_ 1822922088442232832