CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY

An Indonesian IPP located in Bekasi expanded their power capacity by building a coal fired power plant (CFPP) 2x140MW in 2013. The expansion sums up total installed capacity into 1144MW by 2016 which predominantly using gas fuel operated since 1993. Having coal fuel into their portfolio, this expose...

Full description

Saved in:
Bibliographic Details
Main Author: MUTIARA (NIM 29115175), FEBRIANISA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27254
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia