CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY

An Indonesian IPP located in Bekasi expanded their power capacity by building a coal fired power plant (CFPP) 2x140MW in 2013. The expansion sums up total installed capacity into 1144MW by 2016 which predominantly using gas fuel operated since 1993. Having coal fuel into their portfolio, this expose...

Full description

Saved in:
Bibliographic Details
Main Author: MUTIARA (NIM 29115175), FEBRIANISA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27254
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:27254
spelling id-itb.:272542018-02-19T17:02:03ZCASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY MUTIARA (NIM 29115175), FEBRIANISA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27254 An Indonesian IPP located in Bekasi expanded their power capacity by building a coal fired power plant (CFPP) 2x140MW in 2013. The expansion sums up total installed capacity into 1144MW by 2016 which predominantly using gas fuel operated since 1993. Having coal fuel into their portfolio, this exposes Company to volatile nature of Indonesian coal price. This risks cash flow management of the company including possibility of declining business growth due to future business environment. Short of cash flow is dangerous to not only limit decision making alternative ability related to fuel purchase but also increasing risks of Company sustainability over plant 20 years projected operational period as per COSO Enterpise Risk Management (ERM). Multiple scenarios are randomly simulated assumption to project cash flow and its relevant consequences when repayment of senior note due in 2026. Looking from its historical performance, scenario analysis is plotted using Monte Carlo random simulation on possible end of year cash and cash equivalent outcomes. In mitigating this potential problem, research is going to analyze how COSO enterprise risk management framework mitigates possible cash shortcomings. In conclusion, research recommends an cross divisions contribution within company in developing criteria and technical terms & condition that is jointly real-time monitored for immediate response. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description An Indonesian IPP located in Bekasi expanded their power capacity by building a coal fired power plant (CFPP) 2x140MW in 2013. The expansion sums up total installed capacity into 1144MW by 2016 which predominantly using gas fuel operated since 1993. Having coal fuel into their portfolio, this exposes Company to volatile nature of Indonesian coal price. This risks cash flow management of the company including possibility of declining business growth due to future business environment. Short of cash flow is dangerous to not only limit decision making alternative ability related to fuel purchase but also increasing risks of Company sustainability over plant 20 years projected operational period as per COSO Enterpise Risk Management (ERM). Multiple scenarios are randomly simulated assumption to project cash flow and its relevant consequences when repayment of senior note due in 2026. Looking from its historical performance, scenario analysis is plotted using Monte Carlo random simulation on possible end of year cash and cash equivalent outcomes. In mitigating this potential problem, research is going to analyze how COSO enterprise risk management framework mitigates possible cash shortcomings. In conclusion, research recommends an cross divisions contribution within company in developing criteria and technical terms & condition that is jointly real-time monitored for immediate response.
format Theses
author MUTIARA (NIM 29115175), FEBRIANISA
spellingShingle MUTIARA (NIM 29115175), FEBRIANISA
CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY
author_facet MUTIARA (NIM 29115175), FEBRIANISA
author_sort MUTIARA (NIM 29115175), FEBRIANISA
title CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY
title_short CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY
title_full CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY
title_fullStr CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY
title_full_unstemmed CASH FLOW ANALYSIS USING COSO ENTERPRISE RISK MANAGEMENT (ERM) FRAMEWORK ON FUEL PROCUREMENT STRATEGY FOR A SUSTAINABLE OPERATION, A CASE STUDY OF AN INDONESIAN IPP COMPANY
title_sort cash flow analysis using coso enterprise risk management (erm) framework on fuel procurement strategy for a sustainable operation, a case study of an indonesian ipp company
url https://digilib.itb.ac.id/gdl/view/27254
_version_ 1821934322695798784