REROUTING OF EXISTING PUBLIC TRANSPORT AS FEEDER TO MASS RAPID TRANSIT (CASE STUDY : BANDUNG CITY)

<p align="justify">The congestion in Bandung city has triggered the government to develop a plan for mass transit development. However, a problem that typically emerges from such development is its low ridership. The problem is caused by the low connectivity of the new mass transit a...

Full description

Saved in:
Bibliographic Details
Main Author: GEMMA RAHAYU S. B. - NIM : 25014315 , GISTYA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27550
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first