IMPROVING RATE INJECTION WELLS AT SAWAH GATHERING STATION THROUGH LEAN SIGMA METHODOLOGY
The decline of production in Sawah Gathering Station occurs due to several oil wells being shut down due to the non-operation of 5 injection wells. 5 injection wells are turned off due to an oil spill occuring in well Sawah # 87. <br /> <br /> The project team is build to find the root c...
Saved in:
Main Author: | SULISTIO BASUKI / 29115255, HAMZAH |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27661 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS)
by: Wibowo, Kristanto -
OIL WELL PUT ON PRODUCTION CYCLE TIME IMPROVEMENT AT IOC-CORP USING LEAN SIX SIGMA METHODOLOGY
by: Sujana Putra, Doni -
CONTINUOUS IMPROVEMENT OF DRILLING ULTRA-SHALLOW HORIZONTAL WELL THROUGH LEAN SIX SIGMA METHODOLOGY (Study Case: UP* Field in PT. SDEC*)
by: Tri Wahyudi, Petrus -
BUSINESS PROCESS IMPROVEMENT IN CALL CENTER OPERATIONS AT XYZ MALAYSIA THROUGH THE IMPLEMENTATION OF LEAN SIX SIGMA METHODOLOGIES
by: Andini, Trisnawati -
DECISION MAKING TO IMPROVE RELIABILITY WATER INJECTION PUMP AT PH GATHERING STATION PT. ABC
by: Eko Prasetyo, M.