OPTIMIZATION AND DEVELOPMENT OF DAGO PAKAR WATER TREATMENT PLANT (WTP) BANDUNG CITY
Water Treatment Plant (WTP) Dago Pakar is one of the water treatment plant owned by PDAM Tirtawening which serve the North Bandung area with a production capacity of 600 liters/sec. Along with the increasing number of residents in North Bandung in general, the demand of drinking water will also cont...
Saved in:
Main Author: | fauziyyah Amini, Hana |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27666 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RISK ANALYSIS ON WATER SAFETY PLAN (WSP) SOURCE (Case Study : Dago Pakar WTP, PDAM Tirtawening, Bandung)
by: SRI WIDARTI , PAULINA -
REDESIGN OF TIRTAWENING DAGO PAKAR TREATMENT PLANT IN PREVENTION OF TRIHALOMETHANE FORMATION
by: Septiani Mulyawan, Sania -
DESIGN OF CIKALONG WATER TREATMENT PLANT ( WTP ) BANDUNG
by: Nurul Fitri, Adelya -
REDESIGN OF DAGO PAKAR MINI WATER TREATMENT PLANT UNIT OF PDAM TIRTAWENING FOR TRIHALOMETHANE FORMATION PREVENTION
by: LAILA AMALIA NIM : 15314028, FIRDHA -
DESIGN OF WATER TREATMENT PLANT (WTP) KERTASARI BANDUNG REGENCY
by: Saffanah Na'Ima Triani, Sekar