JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING

CV Cipta Sinergi Manufacturing (CSM) is a conventional and CNC-CAD-CAM machining <br /> <br /> company which produces various machining products such as machine components and spare <br /> <br /> parts. CV CSM uses make-to-order system, in which production will be done based...

Full description

Saved in:
Bibliographic Details
Main Author: ATIYA NIM 13414105, HANAYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27673
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:27673
spelling id-itb.:276732018-09-28T14:56:41ZJOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING ATIYA NIM 13414105, HANAYA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27673 CV Cipta Sinergi Manufacturing (CSM) is a conventional and CNC-CAD-CAM machining <br /> <br /> company which produces various machining products such as machine components and spare <br /> <br /> parts. CV CSM uses make-to-order system, in which production will be done based on <br /> <br /> customer’s order. Orders have to be finished in a particular due date. As a make-to-order <br /> <br /> company, CV CSM faces challenge in fulfilling customer’s due date on time. In 2017, 57,8% <br /> <br /> of orders were unable to be finished on time with 9,67 day of delay in average. One of the main <br /> <br /> factors that causes delay in CV CSM is poor scheduling process. Scheduling is done manually <br /> <br /> merely by relying on worker’s judgment without using proper method. <br /> <br /> This study aims to develop job shop scheduling model to minimize tardiness in CV CSM. <br /> <br /> Proposed model is based on linear programming. It has minimization of total tardiness as its <br /> <br /> objective function and considers recirculation constraint. Proposed model is based on linear <br /> <br /> programming. Model computation is performed using LINGO software. <br /> <br /> Proposed model is tested using historical data from CV CSM in the first week of March 2018. <br /> <br /> Proposed model results in 36,36 hour decrease of total tardiness (from 55,44 hour to 19,08 <br /> <br /> hour), or 65,58% from its total tardiness in historical data. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description CV Cipta Sinergi Manufacturing (CSM) is a conventional and CNC-CAD-CAM machining <br /> <br /> company which produces various machining products such as machine components and spare <br /> <br /> parts. CV CSM uses make-to-order system, in which production will be done based on <br /> <br /> customer’s order. Orders have to be finished in a particular due date. As a make-to-order <br /> <br /> company, CV CSM faces challenge in fulfilling customer’s due date on time. In 2017, 57,8% <br /> <br /> of orders were unable to be finished on time with 9,67 day of delay in average. One of the main <br /> <br /> factors that causes delay in CV CSM is poor scheduling process. Scheduling is done manually <br /> <br /> merely by relying on worker’s judgment without using proper method. <br /> <br /> This study aims to develop job shop scheduling model to minimize tardiness in CV CSM. <br /> <br /> Proposed model is based on linear programming. It has minimization of total tardiness as its <br /> <br /> objective function and considers recirculation constraint. Proposed model is based on linear <br /> <br /> programming. Model computation is performed using LINGO software. <br /> <br /> Proposed model is tested using historical data from CV CSM in the first week of March 2018. <br /> <br /> Proposed model results in 36,36 hour decrease of total tardiness (from 55,44 hour to 19,08 <br /> <br /> hour), or 65,58% from its total tardiness in historical data.
format Final Project
author ATIYA NIM 13414105, HANAYA
spellingShingle ATIYA NIM 13414105, HANAYA
JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
author_facet ATIYA NIM 13414105, HANAYA
author_sort ATIYA NIM 13414105, HANAYA
title JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
title_short JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
title_full JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
title_fullStr JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
title_full_unstemmed JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
title_sort job shop scheduling model proposal to minimize tardiness in cv cipta sinergi manufacturing
url https://digilib.itb.ac.id/gdl/view/27673
_version_ 1822922328272535552