JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
CV Cipta Sinergi Manufacturing (CSM) is a conventional and CNC-CAD-CAM machining <br /> <br /> company which produces various machining products such as machine components and spare <br /> <br /> parts. CV CSM uses make-to-order system, in which production will be done based...
Saved in:
Main Author: | ATIYA NIM 13414105, HANAYA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27673 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
by: IZRA MIRNA , RAJA -
Job shop scheduling to minimize work-in-process, earliness and tardiness costs
by: ZHU ZHECHENG
Published: (2010) -
PROPOSED ORDER ACCEPTANCE SYSTEM BASED ON CAPACITY PLANNING IN CV. CIPTA SINERGI MANUFACTURING
by: TANJUNG (NIM : 134 1 3004), ADYATAMI -
PENGEMBANGAN SISTEM PENJADWALAN INTERAKTIF UNTUK PRODUKSI JOB SHOP DENGAN MENGGUNAKAN ALGORITMA GENETIKA PADA CV CIPTA SINERGI MANUFACTURING
by: Mazaya Awanis, Nurshadrina -
A scheduling heuristic for simultaneous minimization of makespan and total weighted tardiness in the open shop setup
by: Siy, Eric A.
Published: (1999)