DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT

Crude and gas pipelines are one of the main supporting facilities for production operation in PT. Chevron Pacific Indonesia. The pipeline is used to delivery crude oil production from gathering stations to storage tank for subsequent loading to Pertamina’s refinery in Dumai, while gas pipelines a...

Full description

Saved in:
Bibliographic Details
Main Author: Iswanto / 29115240, Heri
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27837
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:27837
spelling id-itb.:278372018-03-15T15:21:06ZDEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT Iswanto / 29115240, Heri Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27837 Crude and gas pipelines are one of the main supporting facilities for production operation in PT. Chevron Pacific Indonesia. The pipeline is used to delivery crude oil production from gathering stations to storage tank for subsequent loading to Pertamina’s refinery in Dumai, while gas pipelines are used to distribute own gas production and purchased gas from third party, to power and steam generator stations. <br /> <br /> The integrity of the pipeline system is become an emerging issue, due to the aging pipelines as well as the increased level of safety and environmental risk when the pipeline leak occurs. Pipeline maintenance had been done and successfully maintained the rate of failure, but with the current situation of production declining and lower price of oil commodity, a better pipeline maintenance program and strategy is needed. <br /> <br /> Development of pipeline maintenance program and prioritization is performed by using risk assessment method and risk screening for acceptable level risk. The proposed program and prioritization also consider analysis results of internal and external factors that directly related and root causes of problems. <br /> <br /> The implementation plan of maintenance program and prioritization will be set forth in the company’s annual program and to be reviewed in every end of year for the effectiveness by establishing leading and lagging indicator as targets to be achieved. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Crude and gas pipelines are one of the main supporting facilities for production operation in PT. Chevron Pacific Indonesia. The pipeline is used to delivery crude oil production from gathering stations to storage tank for subsequent loading to Pertamina’s refinery in Dumai, while gas pipelines are used to distribute own gas production and purchased gas from third party, to power and steam generator stations. <br /> <br /> The integrity of the pipeline system is become an emerging issue, due to the aging pipelines as well as the increased level of safety and environmental risk when the pipeline leak occurs. Pipeline maintenance had been done and successfully maintained the rate of failure, but with the current situation of production declining and lower price of oil commodity, a better pipeline maintenance program and strategy is needed. <br /> <br /> Development of pipeline maintenance program and prioritization is performed by using risk assessment method and risk screening for acceptable level risk. The proposed program and prioritization also consider analysis results of internal and external factors that directly related and root causes of problems. <br /> <br /> The implementation plan of maintenance program and prioritization will be set forth in the company’s annual program and to be reviewed in every end of year for the effectiveness by establishing leading and lagging indicator as targets to be achieved. <br />
format Theses
author Iswanto / 29115240, Heri
spellingShingle Iswanto / 29115240, Heri
DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT
author_facet Iswanto / 29115240, Heri
author_sort Iswanto / 29115240, Heri
title DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT
title_short DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT
title_full DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT
title_fullStr DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT
title_full_unstemmed DEVELOPMENT OF MAINTENANCE PROGRAM PRIORITIZATION AND STRATEGY FOR CRUDE AND GAS PIPELINE SYSTEM BY APPLYING RISK ASSESSMENT
title_sort development of maintenance program prioritization and strategy for crude and gas pipeline system by applying risk assessment
url https://digilib.itb.ac.id/gdl/view/27837
_version_ 1822922383430778880