Improvement Performance Management System
The establishment of PT Dirgantara Indonesia (Persero) Company can not be separated from <br /> <br /> the wishes of the founders of this nation so that the country can have an aircraft industry <br /> <br /> capable of meeting national needs for both civil and military needs...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27844 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:27844 |
---|---|
spelling |
id-itb.:278442018-06-23T10:52:18ZImprovement Performance Management System Buldan Sumintapura-29116216, Herman Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27844 The establishment of PT Dirgantara Indonesia (Persero) Company can not be separated from <br /> <br /> the wishes of the founders of this nation so that the country can have an aircraft industry <br /> <br /> capable of meeting national needs for both civil and military needs. <br /> <br /> As a company that is required to provide benefits in managing its operational activities the <br /> <br /> company must have tools to control performance or performance management. The condition <br /> <br /> of PTDI after the implementation of the Restructuring and Revitalization (RR) program <br /> <br /> shows positive developments by achieving good liquidity and can finance contract programs, <br /> <br /> healthy capital and bankable structures, contract acquisitions and increased sales, increase <br /> <br /> production capacity, build cooperation through strategic alliances, to achieve operating profit <br /> <br /> and net income. but from the financial (profit margin) and operating aspects can not reach the <br /> <br /> expected target mainly due to high interest cost of working capital loan and not yet fully able <br /> <br /> to meet the delivery of the product on time. To solve this problem the company has issued a <br /> <br /> performance management system policy as a tool to measure company performance in <br /> <br /> December 2016. <br /> <br /> The authors suspect that the implementation of performance management system is currently <br /> <br /> not perfect so that it needs improvement. For that reason, it is necessary to evaluate and refine <br /> <br /> and redesign the performance management system with Cascading Key Performance <br /> <br /> Indicators (KPIs) using the Balance Scorecard Method. The implementation plan for <br /> <br /> improved performance management will be conducted by conducting workshops organizing <br /> <br /> the key performance indicators of each work plan of each organizational unit by involving all <br /> <br /> structural officials and assisted by subject matter experts who are planned to begin in the <br /> <br /> second week of June 2018 and completed by the end of July 2018. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The establishment of PT Dirgantara Indonesia (Persero) Company can not be separated from <br />
<br />
the wishes of the founders of this nation so that the country can have an aircraft industry <br />
<br />
capable of meeting national needs for both civil and military needs. <br />
<br />
As a company that is required to provide benefits in managing its operational activities the <br />
<br />
company must have tools to control performance or performance management. The condition <br />
<br />
of PTDI after the implementation of the Restructuring and Revitalization (RR) program <br />
<br />
shows positive developments by achieving good liquidity and can finance contract programs, <br />
<br />
healthy capital and bankable structures, contract acquisitions and increased sales, increase <br />
<br />
production capacity, build cooperation through strategic alliances, to achieve operating profit <br />
<br />
and net income. but from the financial (profit margin) and operating aspects can not reach the <br />
<br />
expected target mainly due to high interest cost of working capital loan and not yet fully able <br />
<br />
to meet the delivery of the product on time. To solve this problem the company has issued a <br />
<br />
performance management system policy as a tool to measure company performance in <br />
<br />
December 2016. <br />
<br />
The authors suspect that the implementation of performance management system is currently <br />
<br />
not perfect so that it needs improvement. For that reason, it is necessary to evaluate and refine <br />
<br />
and redesign the performance management system with Cascading Key Performance <br />
<br />
Indicators (KPIs) using the Balance Scorecard Method. The implementation plan for <br />
<br />
improved performance management will be conducted by conducting workshops organizing <br />
<br />
the key performance indicators of each work plan of each organizational unit by involving all <br />
<br />
structural officials and assisted by subject matter experts who are planned to begin in the <br />
<br />
second week of June 2018 and completed by the end of July 2018. |
format |
Theses |
author |
Buldan Sumintapura-29116216, Herman |
spellingShingle |
Buldan Sumintapura-29116216, Herman Improvement Performance Management System |
author_facet |
Buldan Sumintapura-29116216, Herman |
author_sort |
Buldan Sumintapura-29116216, Herman |
title |
Improvement Performance Management System |
title_short |
Improvement Performance Management System |
title_full |
Improvement Performance Management System |
title_fullStr |
Improvement Performance Management System |
title_full_unstemmed |
Improvement Performance Management System |
title_sort |
improvement performance management system |
url |
https://digilib.itb.ac.id/gdl/view/27844 |
_version_ |
1823635867119386624 |