TWO-DIMENSIONAL LEASE CONTRACT WITH PREVENTIVE MAINTENANCE POLICY
The latest financial crisis raised price of some industrial and mining equipment. In the other hand, the price of mining material particularly coal and petroleum recently have fallen. As a result, some of mining companies tend to reduce capital expense. They prefer to hire the equipment from an exte...
Saved in:
Main Author: | ATMAN MAULANA (NIM: 20814010), HUTOMO |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27898 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TWO DIMENSIONAL WARRANTY CONTRACT WITH PREVENTIVE MAINTENANCE POLICY BY CONSIDERING THE DEPENDENCY PARAMETER
by: TIRTA JULINTY (NIM: 20814030), DILA -
TWO DIMENSIONAL WARRANTY CONTRACT WITH PREVENTIVE MAINTENANCE POLICY BY USING ACCELERATED FAILURE TIME (AFT) MODEL
by: THOYYIBAH (NIM: 20814006), SUMAYYAH -
Optimal preventive maintenance of leased equipment
by: Jarumon Jaturonnatee
Published: (2006) -
TWO-DIMENSIONAL LEASE CONTRACT FOR USED PRODUCT WITH UPGRADE LEVEL
by: Amris -
Service Contract with Periodic Preventive Maintenance for Product Sold with a Two-Dimensional Warranty
by: Nasrum, Akbar