FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
<p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: g...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27937 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:27937 |
---|---|
spelling |
id-itb.:279372018-02-21T14:00:09ZFLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27937 <p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: geological modeling and reservoir, development scenario, field development facility, facility development project schedule, calculation and economic analysis. Some uncertainties for each of these POD stages will be simulated using fuzzy time series algorithms with the objective of providing flexibility while maintaining reliability in the decision making process. Fuzzy time series will be applied in answering how big the windows of answer is in this POD case. Based on reference study and experience of modeling practice that has been done, the uncertainty value for Recovery Factor (RF) is obtained ± 10%, Production Capacity is ± 9%, price escalation equal to ± 2% and Net Present Value (NPV) equal to ± 10%. This uncertainty is used as input on fuzzy calculations. Based on simulation and modeling using fuzzy time series, the prediction of uncertainty value from oil price is ± 5.27%, production profile of field "X" is ± 4.8%, withdrawal rate of field "X" is ± 45.81% and NPV of field "X" is 219,618≤NPV≤423,711 MUSD.<p align="justify"> <br /> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: geological modeling and reservoir, development scenario, field development facility, facility development project schedule, calculation and economic analysis. Some uncertainties for each of these POD stages will be simulated using fuzzy time series algorithms with the objective of providing flexibility while maintaining reliability in the decision making process. Fuzzy time series will be applied in answering how big the windows of answer is in this POD case. Based on reference study and experience of modeling practice that has been done, the uncertainty value for Recovery Factor (RF) is obtained ± 10%, Production Capacity is ± 9%, price escalation equal to ± 2% and Net Present Value (NPV) equal to ± 10%. This uncertainty is used as input on fuzzy calculations. Based on simulation and modeling using fuzzy time series, the prediction of uncertainty value from oil price is ± 5.27%, production profile of field "X" is ± 4.8%, withdrawal rate of field "X" is ± 45.81% and NPV of field "X" is 219,618≤NPV≤423,711 MUSD.<p align="justify"> <br />
|
format |
Theses |
author |
AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN |
spellingShingle |
AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM |
author_facet |
AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN |
author_sort |
AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN |
title |
FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM |
title_short |
FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM |
title_full |
FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM |
title_fullStr |
FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM |
title_full_unstemmed |
FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM |
title_sort |
flexibility modeling of plan of development (pod) through the uncertainty consideration using fuzzy algorithm |
url |
https://digilib.itb.ac.id/gdl/view/27937 |
_version_ |
1822922413803831296 |