FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM

<p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: g...

Full description

Saved in:
Bibliographic Details
Main Author: AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27937
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:27937
spelling id-itb.:279372018-02-21T14:00:09ZFLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27937 <p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: geological modeling and reservoir, development scenario, field development facility, facility development project schedule, calculation and economic analysis. Some uncertainties for each of these POD stages will be simulated using fuzzy time series algorithms with the objective of providing flexibility while maintaining reliability in the decision making process. Fuzzy time series will be applied in answering how big the windows of answer is in this POD case. Based on reference study and experience of modeling practice that has been done, the uncertainty value for Recovery Factor (RF) is obtained ± 10%, Production Capacity is ± 9%, price escalation equal to ± 2% and Net Present Value (NPV) equal to ± 10%. This uncertainty is used as input on fuzzy calculations. Based on simulation and modeling using fuzzy time series, the prediction of uncertainty value from oil price is ± 5.27%, production profile of field "X" is ± 4.8%, withdrawal rate of field "X" is ± 45.81% and NPV of field "X" is 219,618&#8804;NPV&#8804;423,711 MUSD.<p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: geological modeling and reservoir, development scenario, field development facility, facility development project schedule, calculation and economic analysis. Some uncertainties for each of these POD stages will be simulated using fuzzy time series algorithms with the objective of providing flexibility while maintaining reliability in the decision making process. Fuzzy time series will be applied in answering how big the windows of answer is in this POD case. Based on reference study and experience of modeling practice that has been done, the uncertainty value for Recovery Factor (RF) is obtained ± 10%, Production Capacity is ± 9%, price escalation equal to ± 2% and Net Present Value (NPV) equal to ± 10%. This uncertainty is used as input on fuzzy calculations. Based on simulation and modeling using fuzzy time series, the prediction of uncertainty value from oil price is ± 5.27%, production profile of field "X" is ± 4.8%, withdrawal rate of field "X" is ± 45.81% and NPV of field "X" is 219,618&#8804;NPV&#8804;423,711 MUSD.<p align="justify"> <br />
format Theses
author AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN
spellingShingle AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN
FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
author_facet AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN
author_sort AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN
title FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
title_short FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
title_full FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
title_fullStr FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
title_full_unstemmed FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
title_sort flexibility modeling of plan of development (pod) through the uncertainty consideration using fuzzy algorithm
url https://digilib.itb.ac.id/gdl/view/27937
_version_ 1822922413803831296