FLEXIBILITY MODELING OF PLAN OF DEVELOPMENT (POD) THROUGH THE UNCERTAINTY CONSIDERATION USING FUZZY ALGORITHM
<p align="justify">Field development planning activities (POD) have various uncertainties that should be included from the initial stage to the final stage in the preparation. In the preparation of POD there are several uncertainties that need to be included in the overall process: g...
Saved in:
Main Author: | AZHAR LUBIS - NIM: 22215010 , IHSANUDDIN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27937 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROJECT MANAGEMENT PLAN OF DEVELOPMENT (POD)
by: Silaban, Andy -
THE NEW COMPACT LIVING : FLEXIBILITY WITH PLUG-IN PODS
by: YEK JIELING BRENDA
Published: (2009) -
Uncertainty modelling and risk optimization approach through fuzzy modelling and evolutionary algorithms for post-pandemic supply chain
by: Evangelista, Danielle Grace D.
Published: (2021) -
Distribution system planning with consideration of uncertainties on both supply and demand sides
by: Le Viet Tien
Published: (2008) -
Reply to Paoli et al.: Explicit consideration of model uncertainties
by: Koh, L.P., et al.
Published: (2014)