DESIGN OF WASTEWATER PLUMBING SYSTEM FOR THREE STAR HOTEL IN SUKABUMI
The total area of three star hotel in Sukabumi that consists of 7 floors and one basement, is 17.466 m2. The designations of each floor are the 1st floor for lobby, <br /> office, retail, and recreational facilities, basement for kitchen and operational area, 2nd to 6th floors for 115 bedroo...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27945 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!