#TITLE_ALTERNATIVE#

Wonogiri dams which is built in 1980 has been shrinked due to sedimentation. Between 6 catchment areas in the upstream of reservoir, Keduang catchment area is the biggest sediment contributor to reservoir. Therefore Balai Besar Wilayah Sungai Bengawan Solo contructs closure dike to intercept and flo...

Full description

Saved in:
Bibliographic Details
Main Author: SETYA PUTRA (NIM : 95015307), INDRA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28047
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia