#TITLE_ALTERNATIVE#
Wonogiri dams which is built in 1980 has been shrinked due to sedimentation. Between 6 catchment areas in the upstream of reservoir, Keduang catchment area is the biggest sediment contributor to reservoir. Therefore Balai Besar Wilayah Sungai Bengawan Solo contructs closure dike to intercept and flo...
Saved in:
Main Author: | SETYA PUTRA (NIM : 95015307), INDRA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/28047 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: PERWIRA PUTRA (NIM 13204165), SETYA -
#TITLE_ALTERNATIVE#
by: DRANA HARRY PUTRA (NIM : 123 08 062), SETYA -
#TITLE_ALTERNATIVE#
by: PRADANASMARA PUTRA (NIM 10105078); Pembimbing: Dr. Wono Setya Budhi, YOSSY -
#TITLE_ALTERNATIVE#
by: Santosa (NIM:13592052), Setya -
#TITLE_ALTERNATIVE#
by: SETYA ARDI (nim : 13614063), NUGRAHA