DESIGN OF POND RETENTION TO CONTROLLING FLOOD IN CIEUNTEUNG VILLAGE, SUB-DISTRICT OF BALEENDAH, WEST JAVA PROVINCE
<br /> <p align="justify"> <br /> <br /> Population increase causing the need for settlement rise and changing of land usage. Absorbing the diminished in upstream areas would cause some problems such as flooding. Considering that most of the sub-district baleendah...
Saved in:
Main Author: | NUR SHOLEHA - Nim: 15814013, INGGIT |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/28064 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COMMUNITY RESILIENCE TO FLOOD AND POLDER DEVELOPMENT PLAN IN CITARUM WATERSHEED (Case Study in Cieunteung, Baleendah Village, Baleendah Sub-District, Bandung District)
by: Ghani Ilmannafian, Adzani -
COMMUNITY RESILIENCE TO FLOOD AND POLDER DEVELOPMENT PLAN IN CITARUM WATERSHEED (Case Study in Cieunteung, Baleendah Village, Baleendah Sub-District, Bandung District)
by: Ghani Ilmannafian, Adzani -
THE EFFECT OF NANJUNG TUNNEL, CISANGKUY FLOODWAY AND CIEUNTEUNG DETENTION POND ON THE FLOODS AND INUNDATIONS CONTROLS IN BANDUNG DISTRICT
by: Phrameswary, Dewi -
RETENTION POND DESIGN AS FLOOD CONTROL OF CIWIDEY RIVER IN SOREANG DISTRICT, BANDUNG REGENCY, WEST JAVA
by: Ilyas Rahardja, M.Fadhillah -
DESIGN OF CISIRUNG RETENTION POND IN OVERCOMING FLOODING IN DAYEUHKOLOT SUB-DISTRICT, BANDUNG REGENCY
by: Zaky, Muhammad