DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR

<p align="justify">Sentul International Circuit Bogor which was built in 1990 is the first circuit built in Indonesia which later introduce Indonesia to MotoGP, an international motorcycle racing competition. Sentul International Circuit has several facilities to support various act...

Full description

Saved in:
Bibliographic Details
Main Author: - NIM : 15014140 , Jeremia
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28254
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:28254
spelling id-itb.:282542018-07-02T14:00:00ZDESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR - NIM : 15014140 , Jeremia Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/28254 <p align="justify">Sentul International Circuit Bogor which was built in 1990 is the first circuit built in Indonesia which later introduce Indonesia to MotoGP, an international motorcycle racing competition. Sentul International Circuit has several facilities to support various activities held in the circuit, such as tribune for the audience and racing track. The writing of this thesis focused on the construction management scheme which includes determining methods of construction, working duration, scheduling and project cost estimation. Methods of construction consist of soil improvement, pile foundation, column, beam, plate and roof truss construction. For circuit track, method that need to be formulated are excavation, heap, road pavement, curb installation, gravel beds installation, and verge works. For drainage system, method that has to be formulated is the work of drainage consisting of U-Ditch and Culvert Box. <p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Sentul International Circuit Bogor which was built in 1990 is the first circuit built in Indonesia which later introduce Indonesia to MotoGP, an international motorcycle racing competition. Sentul International Circuit has several facilities to support various activities held in the circuit, such as tribune for the audience and racing track. The writing of this thesis focused on the construction management scheme which includes determining methods of construction, working duration, scheduling and project cost estimation. Methods of construction consist of soil improvement, pile foundation, column, beam, plate and roof truss construction. For circuit track, method that need to be formulated are excavation, heap, road pavement, curb installation, gravel beds installation, and verge works. For drainage system, method that has to be formulated is the work of drainage consisting of U-Ditch and Culvert Box. <p align="justify"> <br />
format Final Project
author - NIM : 15014140 , Jeremia
spellingShingle - NIM : 15014140 , Jeremia
DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR
author_facet - NIM : 15014140 , Jeremia
author_sort - NIM : 15014140 , Jeremia
title DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR
title_short DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR
title_full DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR
title_fullStr DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR
title_full_unstemmed DESIGN OF CONSTRUCTION METHODOLOGY, COST ESTIMATION, AND SCHEDULING ANALYSIS OF SENTUL INTERNATIONAL CIRCUIT, BOGOR
title_sort design of construction methodology, cost estimation, and scheduling analysis of sentul international circuit, bogor
url https://digilib.itb.ac.id/gdl/view/28254
_version_ 1821995015329546240