REDESIGN OF AIR POLLUTION CONTROL SYSTEM FOR GASEOUS EMISSIONS AT PLTU TANJUNG JATI B
PLTU Tanjung Jati B is a steam power plant with a supply capacity of 4×660 MW located at the edge of Semenanjung Muria Pulau Jawa. With one of the largest production capacities in Indonesia, PLTU Tanjung Jati B can supply around 12% of Indonesia’s total electricity demand to the Java-Bali elec...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29222 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |