REDESIGN OF AIR POLLUTION CONTROL SYSTEM FOR GASEOUS EMISSIONS AT PLTU TANJUNG JATI B

PLTU Tanjung Jati B is a steam power plant with a supply capacity of 4×660 MW located at the edge of Semenanjung Muria Pulau Jawa. With one of the largest production capacities in Indonesia, PLTU Tanjung Jati B can supply around 12% of Indonesia’s total electricity demand to the Java-Bali elec...

Full description

Saved in:
Bibliographic Details
Main Author: HAYKAL ARDHANIKUSUMAH NIM: 15314094, MUHAMMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29222
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items