REDESIGN OF FAECAL SLUDGE TREATMENT PLANT AT IPLT CIBINONG, BOGOR DISTRICT
Cibinong subdistricts own faecal sludge treatment plant that serves four of the districts in Bogor. It was found that the processing unit is not operating. In addition there are also the quality parameters effluent that do not pass quality standards such as domestic wastewater BOD and COD parameter....
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29229 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Cibinong subdistricts own faecal sludge treatment plant that serves four of the districts in Bogor. It was found that the processing unit is not operating. In addition there are also the quality parameters effluent that do not pass quality standards such as domestic wastewater BOD and COD parameter. Such problems will cause delays in processing so that is necessary to redesign the installation. The purpose of this task is to create a redesigning plan and redesigning the installation of the processing unit that will be developed at the faecal sludge treatment plant. IPLT Cibinong is located in an area of 8,900 m2 and there are 55.5% of land area that can be developed. Existing processing units in IPLT Cibinong is Receiving Point, Digesters, Sludge Drying Bed and Anaerobic-Aerobic Biofilter. With a population of 988,794 life services, will be planned processing in two stages. Phase 1 in 2020-2030 and Phase 2 in 2030-2040. After projecting the population at the end of the planning phase, it will get the processing capacity at phase 1 is 50 m3/day and phase 2 is 70 m3/day. There are 3 alternative treatment which will be filed with a focus on the processing of sludge stabilization. Proposed alternative is Anaerobic Sludge Digester, Upflow Anaerobic Sludge Blanket and Aerobic Sludge Digester. Based on the weighted using a Ranking weighted technique parameter with components such as the efficiency, reliability,sludge disposal, land needs, environmental effect, O&M costs, construction costs, sustainibility, and level of ease, it was found that the alternative selected to be applied to the Cibinong faecal sludge treatment plant in sludge stabilization is processing using Anaerobic Sludge Digester. So that the plan of this design, the processing unit will consist of Receiving Point, Anaerobic Sludge Digester, Gravity Thickener, Sludge Drying Bed, Anaerobic-Aerobic Biofilter and Desinfection. |
---|