#TITLE_ALTERNATIVE#
and also pollution to the environment that may occur. Careful planning is required to design an optimum system <br /> <br /> integratedly, by considering kick and blowout as the main problems. In addition to the equipments, <br /> <br /> environmental factors also take part i...
Saved in:
Main Author: | ISRAR FIRDAUS (NIM : 12212005), MUHAMMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29269 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: FAJAR FIRDAUS (nim:15308020), MUHAMMAD -
#TITLE_ALTERNATIVE#
by: FIRDAUS (NIM : 12212081), FANJI -
#TITLE_ALTERNATIVE#
by: FIRDAUS (nim: 15113006), ANDI -
#TITLE_ALTERNATIVE#
by: FIRDAUS NIM: 27115049, ZANIRA -
#TITLE_ALTERNATIVE#
by: FIRDAUS (NIM: 15014093), NISQIYAH