WAY ELA DAM DESIGN PLANNING, LEIHITU DISTRICTS, CENTRAL MALUKU
<p align="justify">The increase in population growth is acompanied by changes in lifestyle affected the increasing needs of society, especially primary needs. Community needs for water and electricity can be categorized into primary needs which are also increasing. To meet the needs...
Saved in:
Main Author: | YUSUF PERMANA - NIM : 15813022 , MUHAMMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29370 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SPILLWAY DESIGN FOR WAY ELA DAM IN CENTRAL MALUKU DISTRICT, MALUKU
by: SILMA - NIM : 15814015 , NAFIDA -
BASIC DESIGN OF MINI HYDROPOWER WAY ELA, MALUKU
by: SANJAYA , YONGKY -
BASIC DAM DESIGN FOR RAW WATER AND ELECTRICITY NEEDS IN NEGERI LIMA, LEIHITU, CENTRAL MALUKU
by: Angga Bayu Putro ( 15813009), Dwi -
ANALYSIS OF MICRO HYDRO POWER PLANT DESIGN IN WAY ELA RIVER CENTRAL MALUKU REGENCY
by: SUTARDI DOGER, DEDI -
LEIHITU MINIHYDRO POWER PLANT DESIGN IN CENTRAL MALUKU REGENCY
by: CAHYA MAULANA (15813029), CACA