PERANCANGAN, PEMBUATAN DAN PENGUJIAN TAHANAN SHUNT UNTUK PENGUKURAN ARUS INPULS
<b>ABSTRACT:</b><br> <br /> <br /> Overvoltage in electrical power system may be produced either due to lightning stroke or switching, where during that process an impuls current of several to tenth of kiloamperes, having extremely high risetime, may be produced. Th...
Saved in:
Main Author: | Muktaher |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/2938 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN, PEMBUATAN DAN PENGUJIAN TAHANAN SHUNT UNTUK PENGUKURAN ARUS IMPULS
by: Mukhtaher -
Perancangan Dan Pembuatan Rangkaian Interface Untuk Pengukuran Kelembapan Udara
by: Moh yasin, -
Published: (1995) -
PERANCANGAN PEMBUATAN ISOLATOR BERBAHAN AIR MURNI UNTUK PENGUJIAN TEGANGAN TINGGI
by: , WAHYU DWI PRASETIYO, et al.
Published: (2013) -
PERANCANGAN, PEMBUATAN DAN PENGUJIAN MODEL AEROELASTIS PENAMPANG JEMBATAN BENTANG PANJANG
by: Sangadji, Senot -
PERANCANGAN, PEMBUATAN DAN PENGUJIAN MODEL AEROELASTIS PENAMPANG JEMBATAN BENTANG PANJANG
by: Sangadji, Senot