MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY

Production activities in CINTA Company (real name of company is disguised due to confidentiality) are using a production pump or commonly called ESP (Electrical Submersible Pump). ESP installed in CINTA Company belong to the vendor A and B. Based on the current procurement contract, there are two...

Full description

Saved in:
Bibliographic Details
Main Author: PRAMUDITA ARIANI (NIM 29316105), NATASYA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29560
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:29560
spelling id-itb.:295602018-06-09T10:50:47ZMULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY PRAMUDITA ARIANI (NIM 29316105), NATASYA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29560 Production activities in CINTA Company (real name of company is disguised due to confidentiality) are using a production pump or commonly called ESP (Electrical Submersible Pump). ESP installed in CINTA Company belong to the vendor A and B. Based on the current procurement contract, there are two vendor that supplying the 3 package pump (package Alpha,Beta,and Charlie) in CINTA Company. The problem in this case is the ESP procurement contract will be expired at the end of 2018 simultaneously with the CINTA Company expired procurement contract in Indonesia in September 2018. <br /> <br /> The methods of this research are of Multi Criteria Decision Making (MCDM) that is Analytical Hierarchy Process (AHP) using 5 criteria ; time, cost, technical, operatiomn, and operation support, 11 subcriteria ; procurement contract preparation, company expired, termination cost, ESP price, ESP specification, ESP reliability, offshore experience, crew experience, safety, ESP warehouse, and ESP transportation, and 2 alternatives, extend the procurement contract and create a new procurement contract. The weight of the criteria is determined by using pairwise comparison matrices of the AHP. Beside, the qualitative hystorical data also support the AHP result combining with the FGD (Focus Group Disscussion) between the expert also the unstructural interview between the expert. <br /> <br /> The best decision are extending the current procurement contract for one year. The results of the study will be given to the management as a consideration for the determination of the procurement contract in this year. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Production activities in CINTA Company (real name of company is disguised due to confidentiality) are using a production pump or commonly called ESP (Electrical Submersible Pump). ESP installed in CINTA Company belong to the vendor A and B. Based on the current procurement contract, there are two vendor that supplying the 3 package pump (package Alpha,Beta,and Charlie) in CINTA Company. The problem in this case is the ESP procurement contract will be expired at the end of 2018 simultaneously with the CINTA Company expired procurement contract in Indonesia in September 2018. <br /> <br /> The methods of this research are of Multi Criteria Decision Making (MCDM) that is Analytical Hierarchy Process (AHP) using 5 criteria ; time, cost, technical, operatiomn, and operation support, 11 subcriteria ; procurement contract preparation, company expired, termination cost, ESP price, ESP specification, ESP reliability, offshore experience, crew experience, safety, ESP warehouse, and ESP transportation, and 2 alternatives, extend the procurement contract and create a new procurement contract. The weight of the criteria is determined by using pairwise comparison matrices of the AHP. Beside, the qualitative hystorical data also support the AHP result combining with the FGD (Focus Group Disscussion) between the expert also the unstructural interview between the expert. <br /> <br /> The best decision are extending the current procurement contract for one year. The results of the study will be given to the management as a consideration for the determination of the procurement contract in this year.
format Theses
author PRAMUDITA ARIANI (NIM 29316105), NATASYA
spellingShingle PRAMUDITA ARIANI (NIM 29316105), NATASYA
MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY
author_facet PRAMUDITA ARIANI (NIM 29316105), NATASYA
author_sort PRAMUDITA ARIANI (NIM 29316105), NATASYA
title MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY
title_short MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY
title_full MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY
title_fullStr MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY
title_full_unstemmed MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY
title_sort multi criteria decision making of electrical submersible pump (esp) procurement system in cinta company
url https://digilib.itb.ac.id/gdl/view/29560
_version_ 1822922961740365824