Feasibility Study Hydrology and Financial of Hydropower (HP) Kemloko Kambangan HP 5 MW
Indonesia has a potential of renewable energy resources for hydropower. According to the RUPTL PLN 2017, the government aims to increase the capacity installed in power plants become 77.9 GW, with 14.1 GW for hydropower plant by year 2026. Batang Regency has a potential water resources that has not...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29577 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |