Feasibility Study Hydrology and Financial of Hydropower (HP) Kemloko Kambangan HP 5 MW
Indonesia has a potential of renewable energy resources for hydropower. According to the RUPTL PLN 2017, the government aims to increase the capacity installed in power plants become 77.9 GW, with 14.1 GW for hydropower plant by year 2026. Batang Regency has a potential water resources that has not...
Saved in:
Main Author: | HARITSA NIM : 13113116, NAUFAL |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29577 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENSTOCK PIPE DIMENSION DESIGN CASE STUDY : PENSTOCK PIPE FOR KAMBANGAN 5 MW MINI HYDROPOWER.
by: Ikbar Wiranto, Wisnu -
Penstock Pipe System Design with Surge Tank and Anchor Block Case Study: Kambangan 5 MW Mini Hydropower Plant
by: Alfian, Candra -
FRANCIS TURBINE 1 MW DESIGN ON MINI HYDROPOWER KAMBANGAN WITH HEAD 87 M AND FLOW RATE 1,4 M\TEXTSUPERSCRIPT{3}/S.
by: Gieraldien Sahertian, Luthfie -
Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
by: Thoriq Al Hafiz, A -
HP printer internal test
by: Garing, Arnel Roland T.
Published: (2008)