THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)

Millennials are distinguished from older generations by their spending habits, brand preferences, values, personalities, and general outlook on life in entirely different ways than have other generations (Barton, Koslow, & Beauchamp, 2014). PT BIG whose have specialized at bed sheet and bed cove...

Full description

Saved in:
Bibliographic Details
Main Author: Kevin Defendy (19015086), Nehemia
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29598
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:29598
spelling id-itb.:295982018-07-16T10:57:53ZTHE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG) Kevin Defendy (19015086), Nehemia Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29598 Millennials are distinguished from older generations by their spending habits, brand preferences, values, personalities, and general outlook on life in entirely different ways than have other generations (Barton, Koslow, & Beauchamp, 2014). PT BIG whose have specialized at bed sheet and bed cover also have a problem related this fact. Operational auditor manager of PT BIG said their warehouse become full for unused goods which is from that phenomenal PT BIG hard to have a space more to produce others. This situation could be happened when sales forecast doesn’t fit enough with market demand and not covered as well. In literature review step we know theories from the experts about forecast and material requirement planning. For forecast using four methods it is moving average, exponential smoothing, Holt’s model, and Winter’s model. Material requirement planning using three kind of methods it is lot sizing or lot-for-lot, economic order quantity (EOQ), and the last one periodic order quantity (POQ). We will compare the forecast and material requirement planning method that suitable with PT BIG. Research method for this paper using both of quantitative and qualitative. Since PT BIG doesn’t have material requirement plan and do it with traditional recording way, from lot sizing, EOQ, and POQ showing lot sizing the suitable MRP method in this case with lowest cost in 90,570,000 IDR for January, February, and March 2018. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Millennials are distinguished from older generations by their spending habits, brand preferences, values, personalities, and general outlook on life in entirely different ways than have other generations (Barton, Koslow, & Beauchamp, 2014). PT BIG whose have specialized at bed sheet and bed cover also have a problem related this fact. Operational auditor manager of PT BIG said their warehouse become full for unused goods which is from that phenomenal PT BIG hard to have a space more to produce others. This situation could be happened when sales forecast doesn’t fit enough with market demand and not covered as well. In literature review step we know theories from the experts about forecast and material requirement planning. For forecast using four methods it is moving average, exponential smoothing, Holt’s model, and Winter’s model. Material requirement planning using three kind of methods it is lot sizing or lot-for-lot, economic order quantity (EOQ), and the last one periodic order quantity (POQ). We will compare the forecast and material requirement planning method that suitable with PT BIG. Research method for this paper using both of quantitative and qualitative. Since PT BIG doesn’t have material requirement plan and do it with traditional recording way, from lot sizing, EOQ, and POQ showing lot sizing the suitable MRP method in this case with lowest cost in 90,570,000 IDR for January, February, and March 2018.
format Final Project
author Kevin Defendy (19015086), Nehemia
spellingShingle Kevin Defendy (19015086), Nehemia
THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)
author_facet Kevin Defendy (19015086), Nehemia
author_sort Kevin Defendy (19015086), Nehemia
title THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)
title_short THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)
title_full THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)
title_fullStr THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)
title_full_unstemmed THE IDEAL MATERIAL REQUIREMENT PLANNING (MRP) SYSTEM FOR PT BANDUNG INDAH GEMILANG (PT BIG)
title_sort ideal material requirement planning (mrp) system for pt bandung indah gemilang (pt big)
url https://digilib.itb.ac.id/gdl/view/29598
_version_ 1822922973205495808