APPLICATION STUDY OF PERFORMANCE BASED ANNUITY SCHEME (PBAS) ON TOLL ROAD (Studi Case : Cisumdawu Toll Road)
<p align="justify">In Indonesia, land transportation is the most favorite choice in distribution commodity. Therefore it is necessary to build road infrastructure in Indonesia. Due to limited funds and government budget, not all roads can be built. Therefore, the government can invol...
Saved in:
Main Author: | HANANTO - NIM: 26914315, PRIMA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29982 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF HYBRID ANNUITY MODEL ON TOLL ROAD IN INDONESIA
by: TRIARSANI RAMADHANTI, DIZKA -
A STUDY OF APPLICATION ON NPV-AT-RISK MODEL AS A TOOL FOR INVESTMENT EVALUATION IN TOLL ROAD INFRASTRUCTURE PROJECT (CASE STUDY: THE DEVELOPMENT OF CISUMDAWU TOLL ROAD)
by: FITRIANI (NIM : 250 03 061); Pembimbing : Dr. Ir. Puti Farida Marzuki; Dr. Ing Andreas Wibowo, HENI -
A STUDY OF TOLL ROAD INVESTMENT RISK FROM VIEWPOINT OF GEOTECHNICAL PROBLEM ON SOIL PILES (A Case Study of Cipularang and Cisumdawu Toll Roads)
by: SUKARNO (NIM : 25003053); Pembimbing : DR. Ir. Ilyas Suratman, CES, DEA., ASEP -
STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
by: NUGROHO, PURWADI -
STUDY OF REFINANCING SCHEME ON TOLL ROAD INFRASTRUCTURE (CASE STUDY: GEMPOL-PANDAAN TOLL ROAD)
by: Nurhadi Sunarya, Nesa