STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )

<p align="justify">Road infrastructure is one of the most prominent factor in driving economic growth in developing country. The costs of developing and maintaining road , combined with lack of national budget to fund it, lead to a more active participation from private sector in for...

Full description

Saved in:
Bibliographic Details
Main Author: NUGROHO, PURWADI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30004
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30004
spelling id-itb.:300042018-03-15T15:06:14ZSTUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU ) NUGROHO, PURWADI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30004 <p align="justify">Road infrastructure is one of the most prominent factor in driving economic growth in developing country. The costs of developing and maintaining road , combined with lack of national budget to fund it, lead to a more active participation from private sector in form of Toll Road Consession. However, some Toll Road route didnt have good financial feasibility and deterring private investment. This study will analys a new Tol Road Concession scheme where investor could also have right to manage a land on toll road corridor to provide additional income and increases financial feasibility <br /> <br /> Case study are located at Cisumdawu Toll Road in West Java, which didn’t have a good financial feasibility. At present, this toll road are built with shared construction responsibilites between GOI and private sector. For the new scheme, land consession are located in Ujung Jaya, Dawuan , close to one of the planned toll road ramp.<p align="justify"> <br /> <br /> <br /> Acording to study, with same amount of supports from GOI, the use of proposed scheme provides higher IRR; NPV and BCR values compared to existing scheme (VGF) with increases of 3,85 % in IRR , Rp.57 Billions (314%) in NPV and 0,25 in BCR value <br /> <br /> <br /> Stakeholder have good appraisement on Land Use Scheme, though increases in capitals needed and worse investment risks lead to worse stakeholder preception value compared to sharing responsibilities scheme which are being used now. According to the study, main risk of Land Use Scheme is land acquisition, income uncertainty and asset management <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Road infrastructure is one of the most prominent factor in driving economic growth in developing country. The costs of developing and maintaining road , combined with lack of national budget to fund it, lead to a more active participation from private sector in form of Toll Road Consession. However, some Toll Road route didnt have good financial feasibility and deterring private investment. This study will analys a new Tol Road Concession scheme where investor could also have right to manage a land on toll road corridor to provide additional income and increases financial feasibility <br /> <br /> Case study are located at Cisumdawu Toll Road in West Java, which didn’t have a good financial feasibility. At present, this toll road are built with shared construction responsibilites between GOI and private sector. For the new scheme, land consession are located in Ujung Jaya, Dawuan , close to one of the planned toll road ramp.<p align="justify"> <br /> <br /> <br /> Acording to study, with same amount of supports from GOI, the use of proposed scheme provides higher IRR; NPV and BCR values compared to existing scheme (VGF) with increases of 3,85 % in IRR , Rp.57 Billions (314%) in NPV and 0,25 in BCR value <br /> <br /> <br /> Stakeholder have good appraisement on Land Use Scheme, though increases in capitals needed and worse investment risks lead to worse stakeholder preception value compared to sharing responsibilities scheme which are being used now. According to the study, main risk of Land Use Scheme is land acquisition, income uncertainty and asset management <br />
format Theses
author NUGROHO, PURWADI
spellingShingle NUGROHO, PURWADI
STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
author_facet NUGROHO, PURWADI
author_sort NUGROHO, PURWADI
title STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
title_short STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
title_full STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
title_fullStr STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
title_full_unstemmed STUDY OF TOLL ROAD INVESTMENT SCHEME WITH ECONOMIC LAND CONCESSION ON ITS CORRIDOR ( CASE STUDY TOL CISUMDAWU )
title_sort study of toll road investment scheme with economic land concession on its corridor ( case study tol cisumdawu )
url https://digilib.itb.ac.id/gdl/view/30004
_version_ 1822923107154788352