COMMUNICATION STRATEGY IN PT LEN INDUSTRY (CASE SMFR MAINTENANCE PROJECT)
PT Len Industry is electronic device provider and service maintenance provider that <br /> <br /> operating all around Indonesia. One of the projects of PT Len Industry is SMFR project. <br /> <br /> SMFR (Radio Frequency Monitoring System) is a solution for monitoring, contr...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30208 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT Len Industry is electronic device provider and service maintenance provider that <br />
<br />
operating all around Indonesia. One of the projects of PT Len Industry is SMFR project. <br />
<br />
SMFR (Radio Frequency Monitoring System) is a solution for monitoring, controlling and <br />
<br />
controlling radio frequency users in order to optimize the implementation of radio frequency <br />
<br />
spectrum, PT Len Industry held cooperation with Minister of Communication and <br />
<br />
Technology in SMFR Project. In maintenance process of SMFR project, PT Len Industry <br />
<br />
frequently facing delay problems that cause by ineffective communication within <br />
<br />
stakeholders. <br />
<br />
Objective of this research is to identify communication problem faced by PT Len Industry in <br />
<br />
SMFR maintenance project, to analyze the communication condition in SMFR maintenance <br />
<br />
projects and to propose communication strategy that can be implemented by PT Len Industry <br />
<br />
in order to create effective communication process to reduce delay problems.Tree cause <br />
<br />
analysis is used to find to root causes of the issue, author also conduct FGD with several <br />
<br />
internal stakeholder that has experience with SMFR maintenance project. While, several <br />
<br />
theories related with communication media ((Media Synchrocitiy Theory), stakeholder <br />
<br />
analysis are used to support author in determining root problems in SMFR maintenance <br />
<br />
project. <br />
<br />
From the analysis result, author found several issue such as time consuming approval <br />
<br />
process, company policy, lack of technology usage in communication tools, gap knowledge <br />
<br />
in team member that become cause of delay problems. After analyzing the current condition <br />
<br />
in SMFR maintenance project, author proposed to select communication media by <br />
<br />
stakeholder preferences, improve intranet system as knowledge sharing media and better <br />
<br />
communication media for internal stakeholder of PT Len Industry, and contains the <br />
<br />
improvement on policy, training and fulfills the aspects related with the root causes. <br />
<br />
Implementation of the strategy is done within a period of up to one year. By implementing <br />
<br />
the expected strategy, PT Len Industry expected to reduce number of delay problems, able to <br />
<br />
build trust within the client and increased its revenue. |
---|