OPERATION PATTERN AND LAYOUT PLAN OF DRY BULK TERMINAL IN THE PORT OF BARITO, SOUTH KALIMANTAN
<p align="justify">Indonesia is the fifth in world’s coal production and produces about 400 million tons of coal per year. The province of South Kalimantan and Central Kalimantan is the second and the third biggest coal producer in Indonesia. Increased production of coal requires...
Saved in:
Main Author: | Naibaho - Nim: 15511047, Rebeka |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30279 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CONSTRUCTION PLANNING OF DRY BULK TERMINAL PORT OF PAMANUKAN, SUBANG REGENCY
by: RAHMANIA YUWONO (NIM 15513054), LAYLI -
LAYOUT DESIGN AND DREDGING PROJECT OF NAVIGATION CHANNEL AND TUNING BASIN AT DRY BULK TERMINAL IN THE C PIER OF DUMAI PORT
by: E M Sirait, Maria -
port, liquid bulk, layout, Teluk Bungus, CPO
by: Kendrew - NIM : 15514072 , Alexius -
DESIGN OF DRY BULK TERMINAL OPERATIONS AT BITUNG PORT PHASE 3, BITUNG CITY, NORTH SULAWESI PROVINCE
by: Danang Suryo Adi, Bagus -
DESIGN OF LAND RECLAMATION FOR THE DEVELOPMENT OF DRY BULK TERMINAL IN CIGADING PORT, BANTEN
by: Mutaqin, Fajrul