REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG

Bandung City is keep trying to find the best solution for their solid waste management system. One of them is to set up a Material Recovery Facility (MRF). According to Peraturan Pemerintah Republik Indonesia Nomor 81 Tahun 2012 Tentang Pengelolaan Sampah Rumah Tangga Dan Sampah Sejenis Sampah Rumah...

Full description

Saved in:
Bibliographic Details
Main Author: DEA TILOTTAMA NIM: 15311015, REGINA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30287
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30287
spelling id-itb.:302872018-03-14T13:31:14ZREDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG DEA TILOTTAMA NIM: 15311015, REGINA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30287 Bandung City is keep trying to find the best solution for their solid waste management system. One of them is to set up a Material Recovery Facility (MRF). According to Peraturan Pemerintah Republik Indonesia Nomor 81 Tahun 2012 Tentang Pengelolaan Sampah Rumah Tangga Dan Sampah Sejenis Sampah Rumah Tangga, the material recovery facility based on 3R (Reduce, Reuse, Recycle) concept, hereinafter referred as TPS 3R, is the place for the implementation of regional waste collection, sorting, reuse, and recycling. TPS 3R which became the design case study is TPS 3R Babakan Sari, which is the first TPS 3R in Bandung with service area surrounding Babakan Sari Subdistrict. The operational activities of waste management at TPS 3R Babakan Sari are still running until now, but there are still many shortcomings during the process. Therefore, this research and design is done to optimize the operational activities and to find the most suitable system alternative so it can be applied to TPS 3R later. The result of waste sampling in Babakan Sari Subdistrict shows that the number of waste generation in the service area is 0,3 kg/person/day for the housing group, and 305 kg/day for the non-housing group. Waste composition is dominated by food waste (59%) and followed by LDPE type of plastic waste such as food or beverage packaging (13%). Using the data of Babakan Sari Subdistrict population as per July 2017, which is 40.527 people, the result of processing the figures will be used to create scenarios and alternatives of waste management system. The results of the redesign shows an increase in the percentage rate of waste reduction due to processing at TPS 3R to be 17%. <br /> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Bandung City is keep trying to find the best solution for their solid waste management system. One of them is to set up a Material Recovery Facility (MRF). According to Peraturan Pemerintah Republik Indonesia Nomor 81 Tahun 2012 Tentang Pengelolaan Sampah Rumah Tangga Dan Sampah Sejenis Sampah Rumah Tangga, the material recovery facility based on 3R (Reduce, Reuse, Recycle) concept, hereinafter referred as TPS 3R, is the place for the implementation of regional waste collection, sorting, reuse, and recycling. TPS 3R which became the design case study is TPS 3R Babakan Sari, which is the first TPS 3R in Bandung with service area surrounding Babakan Sari Subdistrict. The operational activities of waste management at TPS 3R Babakan Sari are still running until now, but there are still many shortcomings during the process. Therefore, this research and design is done to optimize the operational activities and to find the most suitable system alternative so it can be applied to TPS 3R later. The result of waste sampling in Babakan Sari Subdistrict shows that the number of waste generation in the service area is 0,3 kg/person/day for the housing group, and 305 kg/day for the non-housing group. Waste composition is dominated by food waste (59%) and followed by LDPE type of plastic waste such as food or beverage packaging (13%). Using the data of Babakan Sari Subdistrict population as per July 2017, which is 40.527 people, the result of processing the figures will be used to create scenarios and alternatives of waste management system. The results of the redesign shows an increase in the percentage rate of waste reduction due to processing at TPS 3R to be 17%. <br /> <br />
format Final Project
author DEA TILOTTAMA NIM: 15311015, REGINA
spellingShingle DEA TILOTTAMA NIM: 15311015, REGINA
REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG
author_facet DEA TILOTTAMA NIM: 15311015, REGINA
author_sort DEA TILOTTAMA NIM: 15311015, REGINA
title REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG
title_short REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG
title_full REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG
title_fullStr REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG
title_full_unstemmed REDESIGN BABAKAN SARI MATERIAL RECOVERY FACILITY IN BANDUNG
title_sort redesign babakan sari material recovery facility in bandung
url https://digilib.itb.ac.id/gdl/view/30287
_version_ 1822923206842908672