STUDY AND DESIGN OF HYBRID OFF-GRID PV-WIND TURBINE-GENERATOR POWER SYSTEM FOR 20 KWH COMMUNAL LOAD AND 11 KWH ADMINISTRATIVE LOAD AT FATULOTU VILLAGE - EAST NUSA TENGGARA
<p align="justify">Indonesia is a developing country with a population of about 250 million people, so that the needs of electricity in Indonesia is quite high. Increasing electricity needs has not yet been able to overcome by power plants that exist today. In addition to difficulty...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30361 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |