STUDY AND DESIGN OF HYBRID OFF-GRID PV-GENERATOR POWER SYSTEM IN 3T AREA FOR COMMUNAL LOAD 20 kWh AND ADMINISTRATVE 11 kWh AT AMARU VILLAGE-PAPUA
Indonesia is a developing country with a population of about 250 million people, so that the needs of electricity in Indonesia is quite high. Increasing electricity needs has not yet been able to overcome by power plants that exist today. In addition to difficulty reaching remote areas is also a fac...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39420 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |