STUDY AND DESIGN OF HYBRID OFF-GRID PV-GENERATOR POWER SYSTEM IN 3T AREA FOR COMMUNAL LOAD 20 kWh AND ADMINISTRATVE 11 kWh AT AMARU VILLAGE-PAPUA
Indonesia is a developing country with a population of about 250 million people, so that the needs of electricity in Indonesia is quite high. Increasing electricity needs has not yet been able to overcome by power plants that exist today. In addition to difficulty reaching remote areas is also a fac...
Saved in:
Main Author: | Zulqarami, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39420 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY AND DESIGN OF HYBRID OFF-GRID PV-GENERATOR POWER SYSTEM IN 3T AREA FOR COMMUNAL LOADS 20 kWh AND ADMINISTRATIVE LOADS 11 kWh AT JIFAK VILLAGE - PAPUA
by: Evindra, Afrias -
STUDY AND DESIGN OF HYBRID OFF-GRID PV-GENERATOR POWER SYSTEM IN 3T AREA FOR COMMUNAL LOADS 20 kWh AND ADMINISTRATIVE LOADS 11 kWh AT JIFAK VILLAGE - PAPUA
by: Evindra, Afrias -
STUDY AND DESIGN OF PV-GENERATOR OFF-GRID HYBRID POWER GENERATION SYSTEMS IN 3T AREAS FOR COMMUNAL LOADS 20 kWh AND ADMINISTRATIVE LOADS 11 kWh IN PIRIEN VILLAGE â PAPUA
by: Bintang O. Napitupulu, Edo -
Pengaruh beban harmonik terhadap akurasi pengukuran kWh elektromekanis
by: , DJUNAIDI, Achmad, et al.
Published: (2008) -
Pengembangan hasil ukur kWh Meter analog menjadi besaran digital
by: , LAKSANA, Hardian Sakti, et al.
Published: (2005)