ANALYSIS OF HEAT DISTRIBUTION ON VENTILATION NETWORK IN RAMP DOWN 450 KUBANG CICAU MINE UBPE ANTAM PONGKOR
One of the mine sites in UBPE Antam Pongkor is ramp down 450 mines Kubang <br /> <br /> Cicau, complained by workers with the atmosphere of a hot working environment. <br /> <br /> The result of identification of the heat source located at that location consists of a <br /...
Saved in:
Main Author: | YULIANTI (NIM : 22115016), RIRIN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30526 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT OPTIMIZATION FOR GOLD VEIN MINING WITH OPTIONAL CUT-OFF-GRADE AND FUZZY REAL OPTION METHODS : CASE STUDY OF VEIN KUBANG CICAU PT ANTAM TBK PONGKOR
by: Sibarani, Sariuly -
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ -
STUDY OF CARBON MONOXYDE GAS DIFFUSION POST BLASTING AT CIGUHA PT ANTAM UBPE PONGKOR UNDERGROUND MINE
by: Hanif Agson Gani, Putra -
STABILITY EVALUATION AND DESIGN SUPPORT OF TUNNEL ACCESS RAMP UP 4 CENTRAL CIURUG L450 PT. ANEKA TAMBANG TBK UBPE PONGKOR.
by: Yatjong, Isramyano -
STOPE STABILITY ANALYSIS ON SQUEEZING ROCKMASS WITH THREE DIMENSIONAL FINITE ELEMENT MODELING OF PT ANTAM TBK UBPE PONGKOR UNDERGROUND GOLD MINE
by: Yudha, Wira